Home>Products>Bike Production Machine>For Front Fork Process>Others

Pipe & Tube Bender

Auto Pipe Bender Semi Auto Pipe Bender Special Customer Pipe Bender

Bike Production Machine

For Pre-Preparation For Fork Preparation For Front Fork Process
Assembling
Brazing / Spot Welding
Mitering / Lathe
Shape Forming
Forkstem Cutting / Chamfering / Threading
Alignment
Suspension Fork Purpose
Forkend Sealing
Others
For Frame Assembling For Wheel / Rim Making For Bike Assembling For EN Tester For Handlebar Process For Fixture

End Forming Machinery

Pipe Shape Forming Machine Pipe End Forming Machine Pipe End Processing Machine

Electronic Equipment

Automated Dispenser Series Laser Marker Series Equipment for Semiconductor Equipment for Optical Communication Single Mechanism of Automated Equipment

Auto Cell Welding Robot

Hydroforming OEM

Application Equipments
Image of Tube Bending Machine

Bike Production Machine For Front Fork Process


Others

Front Fork Brake Hole Drilling M/C - HT-40-190

Image of Front Fork Brake Hole Drilling M/C - HT-40-190   Image of Front Fork Brake Hole Drilling M/C - HT-40-190

Feature

Two holes drillers working at one operation, RPM changeable: 860/1000/1240.

Specifications

Item Description HT-40-190
Machine Function Suitable Working Range Fork Stem: ∮25.4, ∮28.6 ; Max. drilling hole:10mm
Production 450 pcs/HR
Function Hole Drilling
Mode (Auto/Semi-Auto/Manual) SEMI-AUTO TYPE
Change-over time 10MINUTES
Hydrauic power 1 HP
Coolant water cooling
Electricity consumption 2.34 KW
Electrical Control Power source 380V/3P/50HZ or as request
Machine Outlook Machine Color Shuz Tung green color or as request
Hydraulic Pressure 25 kg/cm²
Dimension (L×W×H) 1750 × 750 × 1250 MM
Net Weight 480 KGS
Tooling Spec. Clamper Per frok stem size